Home » Court Installation

Court Installation

No glue, No contractors.

Huasutile modular court tiles snapped together on any hard flat surface – concrete, asphalt, compacted gravel or existing paving. No adhesive, no power tools, no specialist crew. Most full basketball court builds are done in a single day by 4 people.

Court Installation in a weekend
BEFORE YOU START

4 Bases you can build on

The only requirement is flat, stable surface. Here is what works, and what each base needs before the first tile goes down.

Concrete

Best base

Clean, level and dry. Sweep off dust and confirm a 1%~2% fall so water runs off.

Asphalt

Good

Patch cracks wider than 5mm and make sure the surface is stable, not crumbling at the edges.

Compacted gravel

Good

Compact to 95%+ density, then top with 10mm of grit sand and level. The most common base for new builds.

Existing paving

Check first

Loose or uneven slabs must be re-set and joints filled. Tiles follow the surface below, so level it first.

THE TOOLKIT

6 Tools you already own - that is all the list.

WATCH & LEARN

See the full install in 6 minutes

A straight-to-the-point walkthrough – from swept concrete to the last tile clicked in. No commentary fluff, just the steps that matter.

Chalk the reference row

Every tile after it lines up square to the court.

Lock the snap-together joints

A firm mallet tap seats each connection for good.

Cut and fit the borders

Trim edge tiles for a clean, sealed perimeter.

COMMON MISTAKES

Four Mistakes That Cost a Weekend

None of them are hard to avoid – if you know they are coming.

Don't skip the base check

Run a 2m straight-edge across the base – a 5mm dip shows through every tile.

Don't lay on a wet base

Let concrete cure and dry 24h first – tiles won’t seat on trapped moisture.

Don't forget the expansion gap

Leave 10mm at walls and fixed edges – heat makes tiles grow in summer.

Don't mix tile batches

Slight shade shifts appear between lots – use one batch per court.

QUESTIONS

Before you start

Not directly. You need a hard, flat base - concrete, asphalt, or compacted gravel.

No. The tiles click together and stay put under play - no glue, no screws, no contractors needed.

About one working day with for helpers, covering up to one standard basketball court (92ftx50ft).

Yes. A utility knife trims edge tiles for a clean, sealed perimeter.

Yes. Water drains straight through the open tile base tile base - no puddles after rain.

READY WHEN YOU ARE

Start Your Court This Weekend

You’ve got the steps. We’ll send the layout, the cut list, and the install video – free, in one day.

Become Our Partner
*
Which Huasu tiles are you interested in?
Contact Huasutile
Tell us about your court project.
Contact Huasutile
We are ready to help.