Home » Galleries » 500 m² Community Basketball Court in Pu’er, Yunnan

Project Name: Community Basketball Court at Ximeng, Pu'er, Yunnan, China

Court Area: 500 m²
Installation Date: June 5, 2026
Project Highlights:
  • Location: A community at Ximeng, Pu’er, Yunnan, China.
  • Project type: A full basketball court for community use.
  • Area: 500 m².
  • Installation date: June 5, 2026.
  • Customer: Community residents’ committee.
  • Installed product: Huasutile DB.
  • Climate and surface features: according to the company’s oral project confirmation, the local climate is relatively humid, and the DB tile uses a double-layer textured pattern with relatively large openings intended to support drainage, with slip resistance and resistance to varied climate conditions. These statements are not independently verified.
  • Installation status: Fully completed; the customer was reported to be very satisfied.
  • Warranty: the company orally confirmed a 10-year warranty for this installation. Detailed warranty scope, exclusions, and written proof were not provided.
  • Evidence status: No project technical report or substrate documentation was provided. These items remain PARTIAL and are not inferred.
Project Overview:

500 m² Community Basketball Court in Pu’er, Yunnan

— A completed community court for a humid local climate

At a community in Ximeng, Pu’er, Yunnan, China, a full basketball court covering 500 m² was completed on June 5, 2026. The customer was the community residents’ committee, and the company reports that the customer was very satisfied with the completed court.

The installation uses Huasutile DB PP interlocking tiles. Based on the company’s oral project confirmation, the DB tile has a double-layer textured pattern and relatively large openings intended to support drainage. The same confirmation describes the product as slip-resistant and suitable for varied climate conditions. These performance statements are retained as unverified project information and are not presented as independently tested results.

This project is relevant to searches for community basketball court tiles in Yunnan, humid-climate basketball court flooring, and DB PP interlocking basketball court tiles. The product model and project details are included as supplied; no additional technical specifications, drainage rate, slip-resistance value, substrate method, or installation measurement has been invented.

The company also orally confirmed a 10-year warranty for the installed Huasutile DB product. Written warranty scope and exclusions were not provided, so the warranty statement requires review before public release.

Explore more Huasutile project gallery examples, including the related community basketball court project used as a structural reference for this draft. Five project images are attached, with conservative project-based ALT text. Project technical reports, substrate information, independent performance evidence, and written warranty documentation are not available and remain PARTIAL.

Project status: Draft only. Not for publication until the evidence and release approval requirements are addressed.

Become Our Partner
*
Which Huasu tiles are you interested in?
Contact Huasutile
We are ready to help.