Project Name: 2,800 m² Mingshan District Exper. Prim. Sch. Multi-Sport Court Project
- Project: Mingshan District Exper. Prim. Sch. Multi-Sport Court Project
- Location: Mingshan District, Ya’an, Sichuan, China
- Total site area: 2,800 m², including the courts and surrounding extension areas
- Facilities: 1 basketball court, 1 hockey court, 3 badminton courts and 1 table tennis court
- Flooring model: Huasutile T-XM
- Color and line-marking scheme: Blue #8659 and Green #8660
- Recorded construction period: 1 week
A 2,800 m² multi-sport court project in Mingshan District
Mingshan District Exper. Prim. Sch. in Mingshan District, Ya’an, Sichuan, China is the location of this 2,800 m² school multi-sport court flooring project. The documented scope includes one basketball court, one hockey court, three badminton courts, one table tennis court and the surrounding extension areas. The project used Huasutile T-XM in Blue #8659 and Green #8660, and the recorded construction period was one week.
The project brief: one site, several sports
The supplied project record defines six activity areas within the total site: one basketball court, one hockey court, three badminton courts and one table tennis court. The 2,800 m² figure also includes the surrounding extension areas.
For school buyers, contractors and distributors, these quantities provide a concrete comparison point for a multi-sport brief. They identify the site scale, the number and types of activity areas, the flooring model, the color schedule and the recorded construction period without adding unsupported performance claims.
The evidence-bounded cooperation story
The supplied project record establishes the facts available for this case: a 2,800 m² total area, the specified facility mix, Huasutile T-XM, Blue #8659 and Green #8660, the line-marking scheme and a recorded one-week construction period. These supplied items define what this case study can state about the project.
The supplied evidence does not identify private stakeholders, discussions, responsibilities, approval stages, motives, customer feedback or a detailed chronology. Those details are therefore omitted. The case is presented through the confirmed project brief and finished-site evidence rather than a reconstructed narrative.
Organizing a 2,800 m² school sports area
The total footprint combines the dedicated courts with the surrounding extension zones. Within that footprint are the basketball and hockey areas, three badminton courts and one table tennis court. This facility mix makes the project relevant to buyers comparing a multi-use school sports area with a single-purpose court.
From an editorial planning perspective, documenting the area and facility counts together helps prospective buyers define their own brief. Future projects still require evaluation against their individual site conditions, sport requirements and local standards.
Blue #8659 and Green #8660 color and line scheme
The recorded palette for this project is Blue #8659 and Green #8660. The project record also identifies a line-marking scheme across the multi-sport area. No safety, visibility or performance result is attributed to these colors because no such result was supplied.
For buyers preparing a comparable project, recording exact color codes alongside the court count provides a more specific reference than images alone. Final color and marking decisions should be based on the requirements of each project.
Huasutile T-XM used for the court surface
The flooring model recorded for this project is Huasutile T-XM sport court flooring tiles. This case confirms the product model used; it does not add material, safety, drainage, ball-response, certification, durability or warranty claims that are not supported by the supplied project evidence.
Buyers who need current technical specifications can review the T-XM product page and request documentation for their exact application. This keeps the link between the real project and the named product clear while preserving the evidence boundary.
A one-week recorded construction period
The supplied facts record a construction period of one week. They do not define whether that period includes procurement, transport, base preparation or only on-site construction. The statement is therefore retained exactly at the documented level, and no future-project schedule is inferred from it.
What this case can help B2B buyers evaluate
This Mingshan District Exper. Prim. Sch. project offers a factual reference for a large school multi-sport court: 2,800 m², six activity areas, surrounding extension space, Huasutile T-XM, two recorded colors and a one-week construction period.
The case does not claim customer endorsement, measured improvement or a commercial outcome. Its value is the traceable project configuration that schools, facility planners, contractors and distributors can compare with their own requirements.
Frequently asked questions
How large was the Mingshan District Exper. Prim. Sch. sport court project?
The recorded total site area was 2,800 m², including the listed courts and surrounding extension areas.
Which sports areas were included?
The project included one basketball court, one hockey court, three badminton courts and one table tennis court.
Which Huasutile product was used?
The recorded flooring model was Huasutile T-XM.
Which colors were selected?
The recorded color and line-marking scheme used Blue #8659 and Green #8660.
How long did construction take?
The supplied project record states a one-week construction period. It does not define which pre-construction or logistics stages, if any, were included.
Plan a school multi-sport court project